Emerson 3000 installation manual Condenser Coil

Models: 3000

1 88
Download 88 pages 36.41 Kb
Page 39
Image 39
Condenser Coil

Air-Cooled Models—Self-Contained Compressor

Figure 17 General arrangement—Air-cooled models with Liebert Lee-Temp

Inverted Trap * on discharge line toManual background extend above base Manual backgroundManual background of coil by a minimum Manual backgroundManual backgroundManual background of 7-1/2" (190mm) Manual backgroundManual backgroundManual backgroundManual background

Condenser Coil

 

Piping Assembly * *

Check

 

Valve

Rotalock Valve * *

Head Pressure

Control with

Integral Check

Valve

Traps * Every

 

25 Ft. (7.6m)

 

of rise on Hot

Liquid Return

Gas Line only

 

from Condenser

Manual background Hot Gas

Bypass

Valve

Solenoid

Valves Manual backgroundManual backgroundManual backgroundManual background

Shutoff

Sight Glass

Valve *

 

Filter Dryer

Liebert

Lee-Temp

Receiver

Expansion

Valve

Manual backgroundManual background 1/4" ( 6.4mm)

Pressure Relief Valve * *

Sight Glass

Evaporator Coil

Sensing Bulb

Liquid Return

 

External

Service

 

 

Equalizers

Valves

 

 

Hot Gas

Scroll

 

Bypass

 

Compressor

 

 

* Components are not supplied by Liebert

Check Valve

but are recommended for proper

circuit operation and maintenance.

Hot Gas Discharge

* * Components supplied by Liebert

 

and must be field installed.

FACTORY PIPING

 

OPTIONAL PIPING

DPN000674

FIELD PIPING

Rev. 02

 

33

Page 39
Image 39
Emerson 3000 installation manual Condenser Coil