Emerson 400A manual INSTALLATION continued, Voltage Checks

Models: 400A

1 20
Download 20 pages 59.04 Kb
Page 8
Image 8
INSTALLATION (continued)

INSTALLATION (continued)

observe these lights

Figure 1–5. Standard controls and indicators.

2 – Voltage Checks

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.

Use extreme caution when using a meter to measure voltages in the following steps.

Do not touch power terminals; shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–5.

OBlack circle means light is on. P White circle means light is off.

*If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Also see page 4–1 for the HI–LOW voltage adjust

Close the normal source circuit

 

breaker. The Normal Transfer

Source Accepted

1 Switch Position and the Normal

Normal

Source Accepted lights should

Emergency

come on.

 

Use an accurate voltmeter to check phase to phase and

2 phase to neutral voltages pres- ent at the transfer switch normal source terminals.

Close the emergency source

Source Accepted

circuit breaker. (Start generator,

3 if necessary.) The Emergency

Normal

Source Accepted light should

Emergency

come on.

 

Use an accurate voltmeter to check phase to phase and

4 phase to neutral voltages pres- ent at the transfer switch emer- gency source terminals.*

setting in the controller. The LOW setting shifts all

Use a phase rotation meter to

A B C

voltage settings down 4.2%; for example, 240 V to 230 V.

5 check phase rotation of emer- gency source; it must be the same as the normal source.

Shut down the engine–genera-

 

tor, if applicable. The Emergen-

Source Accepted

cy Source Accepted light should

6 go off. Then put the starting

Normal

control selector switch (on the

Emergency

generator set) in the automatic

 

position. Close enclosure door.

 

Now continue to 3 – Electrical Operation on next page.

1---4

Page 8
Image 8
Emerson 400A INSTALLATION continued, Voltage Checks, Do not touch power terminals shock, burns, or death could result