Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 2-1 Mechanical Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . page 2-1 Gas Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 2-2 Electrical Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 2-4

This section describes SPS 4001B installation.

Before starting to install this equipment, read the "Safety instructions for the wiring and installation of this apparatus" in Section A: Safety Data. Failure to follow the safety instructions could result in serious injury or death.

Secure equipment cover and ground leads after installation. Failure to secure covers and ground leads could result in serious injury or death.

The outline drawing in Figure 2-1shows mounting centers and clearances of the SPS 4001B. The unit is designed to mount on a wall, bulkhead, or pipe. Ensure the unit is installed according to the following specifications.

1.Install the unit no further than 300 ft (91 m) from the Oxymitter 4000 and no further than 1000 ft (303 m) from the electronics package or any customer-supplied remote input or relay output in the control room.

2.Locate the unit where the ambient temperature is between -25° and 149°F (-5° and 65°C) or -40° and 149°F (-40° and 65°C) with optional heater.