Emerson manual SS-100 to Reflecs Steps, Wiring Layout with UltraSite

Models: SS-100

1 15
Download 15 pages 45.47 Kb
Page 9
Image 9
Wiring Layout with UltraSite

7.Plug 110VAC/5VDC power transformer into the SS-100.

Wiring Layout with UltraSite

SS-100 to Reflecs Steps

1.Connect the 25-pin end of the D25/DB9 straight- through connector to the SS-100.

2.Connect the 9-pin female end of the laptop cable to the straight-through serial connector.

3.Connect the SS-100 to the hub using the RJ-45 able.

4.Plug the 4-position plugable connector into the Reflecs controller.

5.Plug 110VAC/5VDC power transformer into the SS-100.

SS-100 Serial Server

SS-100 Wiring Requirements • 3

Page 9
Image 9
Emerson manual SS-100 to Reflecs Steps, Wiring Layout with UltraSite