Emerson Process Management 3051N manual Changes from June 2006 to June, Old

Models: 3051N

1 100
Download 100 pages 19.52 Kb
Page 5
Image 5

Reference Manual

00809-0100-4808, Rev CA June 2008

Rosemount 3051N

Revision Status

 

 

Changes from June 2006 to June 2008

 

 

 

Page (Old)

Page (New)

Changes

 

 

 

Cover,

Cover,

Document revision date change from June 2006 to June 2008,

throughout

throughout

rev from BA to CA

 

 

 

TOC-1

Page i, back

CE mark added with Rosemount Nuclear Instruments, Inc.

 

cover

 

-Page iii Add Revision Status page

TOC-1 to TOC-8

i to iv and TOC-1

Page numbers changed

 

to TOC-4

 

 

 

 

Throughout

Throughout

Manual number corrected to 00809-0100-4808

 

 

 

3-6 and 3-8

3-6 and 3-8

Changed significant digits to conform to standard

 

 

 

3-12

3-12

Removed word ‘process’ from sentences indicating user responsibility for qualifying the connection

 

 

interface

 

 

 

5-7

5-8

Reworded flange bolt description to reflect qualification configuration

NOTE

The above Revision Status list summarizes the changes made. Please refer to both manuals for complete comparison details.

www.rosemountnuclear.com

Page 5
Image 5
Emerson Process Management 3051N manual Changes from June 2006 to June, Old