035-18496-000-C-1102

AIR

AIR

1

AIR

BLOWER

 

EVAPORATOR

 

COIL

R

*

A I

4

 

*

VERTICAL ARRANGEMENTS

2

3

AIR

 

AIR

AIR

*

*

5

6

AIR

 

AIR

AIR

*

*

AIR

AIR

*IF REQUIRED, SOME AIR CAN BE BROUGHT THROUGH THE BOTTOM OF THE EVAPORATOR SECTION.

FIGURE 6 - VERTICAL AIRFLOW ARRANGEMENTS

7

8

AIR

 

9

AIR

10

AIR

AIR

 

AIR

 

11

AIR

 

AIR

 

AIR

 

AIR

AIR

12

AIR

AIR

FIGURE 7 - HORIZONTAL AIRFLOW ARRANGEMENTS

10

Unitary Products Group

Page 10
Image 10
Energy Tech Laboratories LB300, LB480, LB360, LB600 installation manual Vertical Airflow Arrangements, Vertical Arrangements