Completing the Installation
c.Verify that the fiber connection meets the dB loss and cable specifications for multimode cabling, as outlined in the Cabling Guide.
If a link is not established, see Chapter 4 before contacting Enterasys Networks. Refer to “Getting Help” in About This Guide for details.
3.6COMPLETING THE INSTALLATION
After installing the module and making the connections to the network, proceed as follows:
1.If the chassis is installed in a rack that has
2.The module is now ready to be configured through Local Management. Refer to the MATRIX E7 Series and SmartSwitch 6000 Series Modules Local Management User’s Guide for information on how to access and use Local Management. For details on how to get manuals, refer to “Related Documents” in About This Guide.
Installation