Installing the Switch on a Flat Surface
SecureStack A2 Installation Guide 3-9
Ifyouareinstallingseveralswitchesinastack,proceedtoConnectingStackingCablesonpage 311.Iftheswitchisbeinginstalledasastandaloneswitch,proceedtoConnectingACandRPSSYSPoweronpage 316forpowerconnectioninstructions.Figure 3-5 Area Guidelines for Switch Installation on Flat Surface
Caution: To ensure proper ventilation and prevent overheating, leave a minimum
clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.
Do not connect the switch to the AC power source until instructed to do so later in the
installation process.
Precaución: Para asegurar una buena ventilación y evitar que el sistema se
sobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y
a la parte posterior del aparato.
No conecte el dipositivo a la fuente primaria hasta que no se le indique.
1Approximately 152 cm (5 ft) from power source 344.5 cm (19.4 in.) for proper ventilation
24.45 cm (1.75 in.) per switch. (Vertical clearance
depends on number of switches stacked.)
441.9 cm (16.5 in.) for proper ventilation
Á
Ã
À
Console CPU
RPS
MGR
1357911131517192123
24 6 8 101214 16 18 20 22 24
25
26
27
28
25/Up 26/Down
Stack
27 28
2 8 10 1246
179113 5 13 19 21 2315 17
14 20 22 2416 18
Â