Mounting 3

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

Mounting

This switch can be mounted in a standard 19-inch equipment rack or on a desktop or shelf. Mounting instructions for each type of site follow.

Rack Mounting

Before rack mounting the switch, pay particular attention to the following factors:

Temperature: Since the temperature within a rack assembly may be higher than the ambient room temperature, check that the rack-environment temperature is within the specified operating temperature range. (See page C-1.)

Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.

Circuit Overloading: Be sure that the supply circuit to the rack assembly is not overloaded.

Grounding: Rack-mounted equipment should be properly grounded. Particular attention should be given to supply connections other than direct connections to the mains.

To rack-mount devices:

1.Attach the brackets to the device using the screws provided in the Bracket Mounting Kit.

25

26

Link

 

/Act P

 

WR

PoE

Diag

 

25

 

26

Stacking

 

PMode oE/Link

V2H124-24P

Figure 3-2. Attaching the Brackets

3-3

Page 37
Image 37
Enterasys Networks V2H124-24P manual Optional Rack-Mounting Equipment, Rack Mounting