Initial Installation
QUALIFIED INSTALLERS ONLY
Mantel Clearances:
It is not necessary to install a mantel, but if one is desired it is important to follow the guidelines shown in Figure 22. The Manor face has a different set of mantel clearances than the other faces, see
Figure 23.
Combustibles | 8" (203mm) mantel |
| 3½" (89mm) |
| 20" |
| (508mm) |
| 17" |
10" | (432mm) |
(254mm) |
|
| 12" |
| (305mm) |
DV42DX |
|
| Cement Board |
Figure 22. Combustible Mantel Clearances.
Combustibles |
|
| 8" (203mm) mantel |
| 17" |
10" | (432mm) |
(254mm) |
|
| 12" |
| (305mm) |
DV42DX |
|
with Manor |
|
| Cement Board |
Figure 23. Combustible Mantel Clearances for The
Manor
Vent Termination Restrictions: |
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| N |
|
|
|
|
|
|
|
|
| O |
D | E |
|
|
|
|
| H |
|
|
B |
|
|
|
|
|
|
| ||
| C |
|
|
|
|
|
|
| |
L | B | Fixed |
|
| B |
|
|
| G |
F | Closed | Openable | Fixed |
|
| G |
| ||
| Openable | Closed |
|
|
| ||||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
| M |
| |
| B |
| A |
| J |
|
| K | |
|
|
|
|
|
| ||||
|
|
|
|
|
| I | A | ||
| Termination Cap |
| Air Supply Inlet |
|
| ||||
|
| G | Gas Meter | Restriction Zone |
| ||||
|
|
|
|
|
|
|
| (Termination not allowed) |
|
Figure 24. Vent Termination Restrictions, refer to Table 2.
17