Initial Installation

QUALIFIED INSTALLERS ONLY

STEP 5. Cut hole in the roof centered on the small hole placed in the roof from Step 2. The hole should be of sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support box up through the roof line. Galvanized pipe and elbows may be utilized in the attic, as well as above the roof line. The galvanized finish is desirable above the roof line, due to the higher corrosion resistance.

STEP 6. Once the pipe sections have been joined, and run up through the hole in the roof, slip an elbow strap over the exposed sections, bend the support straps outwards, and push the elbow strap down to the roof level, as shown in Figure 33. Tighten the clamp around the pipe section. Use a level to make sure the pipe is truly vertical. With roofing nails, secure the support straps to the roof. Seal the nails holes heads with non-hardening mastic. Trim the excess length of the support straps that extend out beyond the edge of the flashing.

STEP 7. Slip the flashing over the pipe section protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Use a non-hardening sealant between the uphill edge of the flashing and the roof. Insure the roofing material overlaps the top edge of the flashing. Verify that you have at least the minimum clearance to combustibles at the roof line.

STEP 8. Continue to add pipe sections until the height of the vent cap meets the minimum code requirements. Refer to Figure 34 and Table 6. Note that for steep roof pitches, the vent height must be increased. In high wind conditions, nearby trees, adjoining roof lines, steep pitched roofs, and other similar factors can result in poor draft, or down drafting. In these cases, increasing the vent height may solve the problem.

STEP 9. Slip the storm collar over the pipe, and push it down to the top of the roof flashing as shown in Figure 33. Use the non-hardening sealant around the joint between the pipe and the storm collar.

STEP 10. Twist-lock the vent cap.

Figure 34: Height of Vertical Termination;

Reference Table 6.

Table 6: Minimum ‘H’ for Figure 34.

Roof Pitch

Minimum Height (H)

 

 

 

 

Feet

Meters

 

 

 

Flat to 7/8

1

0.3

 

 

 

Over 7/12 to 8/12

1.5

0.46

 

 

 

Over 8/12 to 9/12

2

0.61

 

 

 

Over 9/12 to 10/12

2.5

0.76

 

 

 

Over 10/12 to 11/12

3.25

0.99

 

 

 

Over 11/12 to 12/12

4

1.22

 

 

 

Over 12/12 to 14/12

5

1.52

 

 

 

Over 14/12 to 16/12

6

1.83

 

 

 

Over 16/12 to 18/12

7

2.13

 

 

 

Over 18/12 to 20/12

7.5

2.29

 

 

 

Over 20/12 to 21/12

8

2.44

 

 

 

26

Page 26
Image 26
Enviro 50-645, C-11278, C-10078 owner manual Roof Pitch Minimum Height H Feet Meters

50-645, C-10078, C-11278 specifications

Enviro C-11278, 50-645, and C-10078 are innovative solutions designed to address the growing environmental challenges faced by industries today. These products are crafted with a forward-thinking approach, centered on sustainability, efficiency, and effectiveness in various applications.

One of the main features of Enviro C-11278 is its advanced formulation that combines bio-based components with traditional materials, resulting in a product that minimizes environmental impact while maintaining high performance. This formulation is designed to reduce emissions, lower toxicity, and enhance biodegradability, making it an eco-conscious choice for industries ranging from manufacturing to construction.

The Enviro 50-645 stands out for its versatility and adaptability in various operational settings. Engineered to function effectively under diverse conditions, it integrates seamlessly into different processes, requiring minimal adjustments. Its robust composition ensures durability and longevity, reducing the need for frequent replacements, and ultimately contributing to waste reduction.

C-10078 is particularly noted for its cutting-edge technology that incorporates smart monitoring capabilities. This feature allows for real-time data collection and analysis, enabling users to optimize processes and reduce resource consumption. The intelligent design not only enhances efficiency but also supports compliance with environmental regulations, making it a valuable asset for companies striving for sustainability.

In terms of characteristics, all three products exhibit high resistance to chemical degradation, ensuring consistent performance over extended periods. They are also formulated to be water-resistant, providing reliability in varied environmental conditions. The eco-friendly nature of these products does not compromise their performance; conversely, they are designed to outperform many traditional solutions in both effectiveness and safety.

Furthermore, the manufacturing processes for Enviro C-11278, 50-645, and C-10078 focus on minimizing energy consumption and reducing waste. By prioritizing renewable resources and sustainable practices, these products not only serve their intended purpose but also align with global efforts to combat climate change.

In summary, Enviro C-11278, 50-645, and C-10078 represent a significant advancement in environmentally responsible product offerings. Their unique features, innovative technologies, and commitment to sustainability position them as optimal choices for industries looking to reduce their ecological footprint while ensuring operational efficiency and safety. By integrating such products, businesses can take meaningful steps towards a greener future.