Enviro EF-119 owner manual Installation, This unit includes a 3” 75 mm pedestal

Models: EF-119

1 39
Download 39 pages 20.59 Kb
Page 24
Image 24
This unit includes a 3” (75 mm) pedestal

 

 

Installation

INSTALLATION FOR A BUILT-IN HEATER:

 

Combustible

 

This unit includes a 3” (75 mm) pedestal

 

and surrounding faceplates. The part of the

materials and

 

structure

 

unit behind the faceplate can be enclosed

 

 

 

with combustible material. It has 1” (25

Surround Panel

Wall

mm) standoffs to establish clearances to

 

 

thimble

combustibles to the back, top and sides.

 

 

12"

Refer to “CLEARANCES TO COMBUSTIBLES - BUILT-IN

 

 

(30.5 cm)

 

 

45°

HEATER“ and Figure 6 and 7 for the size and

 

 

placement of the alcove to be built for the

 

 

elbow

 

 

 

unit.

6"

 

Rodent

For the venting refer to “HORIZONTAL EXHAUST

(15 cm)

 

mesh cap

THROUGH WALL INSTALLATION - FREESTANDING“.

 

 

Fresh air

 

 

 

intake

 

Non-combustible

 

Existing floor

 

 

(combustible)

 

floor protection.

3" (7.5 cm)

 

 

Pedestal

 

 

Figure 30: Built-in heater installation.

INSTALLATION OF CONTROL PANEL INTO SURROUND PANEL - FPI AND BIH:

When installing the control panel into the surround panel, the surround does not need to be assembled. The control board will be found in behind the firebox.

Place the control panel on the backside of the right surround panel so the hinge is on the outside and the top and bottom holes on the control panel line up with those on the surround. Attach using two

(2) T-20 screws through the front of the surround into the circuit board control panel.

After the surround has been assembled and is ready to be installed on the unit, plug the wiring harness into the control panel (see Figure 32).

Figure 31: Control Panel Cover.

����

Figure 32: Control Panel Back

- Timer.

24

Page 24
Image 24
Enviro EF-119 owner manual Installation, This unit includes a 3” 75 mm pedestal