79
Procedure
1
Turn off the projector power, wait
for the cool-down period to end,
and then disconnect the power
cable.
The cool-down period lasts for about 45
seconds. The actual time will vary
depending on the external air
temperature.
2
Put your finger into the recess in
the air filter hook, and lift up the air
filter to remove it.
3
Install the new air filter.
First insert the tabs, and then press down
on the opposite side until it clicks into
place.
Tip :
Dispose of used air filters properly in accordance
with your local regulations.
Replacing the Air Filter