CONFIGURING THE ETA-ECM2063

ETA-ECM2063

AC Power Distribution Sequencer

CONFIGURING THE ETA-ECM2063

The ETA-ECM2063 is designed to be activated/triggered by a sequence controller like the ETA Systems ETA-SEQ6 or the ETA-ECS6RM. The ETA-ECM2063 can be configured to accept from 1 to 3 separate hard wired 20A circuits. There are three individual load sections in the ETA-ECM2063. Each load section has two separate sequence channels, with each channel having two 20A, 120VAC outlets. In summary, the ETA-ECM2063 has a total of 12 AC outlets divided into 6 sequenced channels that can be divided or combined into 3 20A circuits. Note: All electrical wiring must be done by a certified electrician.

Channel Control Ports

There are 6 channel control ports that correspond with the 6 AC outlet channels. Activation or triggering a channel of the ETA-ECM2063 is done by shorting two of the channel control port pins together. An activation sequence can be triggered using an ETA-SEQ6 or ETA-ECS6RM sequence controller or by using another external device such as a hard contact switch to trigger a channel. If a section is required to be “always ON”, connect a jumper between the control port pins to the corresponding channel.

Channel Status Indicators

Each channel has a bi-color LED that designates the status of that specific channel.

No LED illuminated indicates there is no AC Mains power present at that channel.

Red illumination indicates there is AC Mains power present and that channel is ready to be activated.

Green illumination indicates the corresponding AC output channel is active and 120VAC is present.

Load Distribution

There are four different load distribution combinations for the ETA-ECM2063. The ETA-ECM2063 has 6 channels that are divided into three load circuits. This is to allow up to three separate 20A 120VAC mains lines to be applied to the ETA-ECM2063. It is not required to apply three circuits; you can parallel a single 20A line to all three load sections.

Channels 1 & 2 are connected to L1

Channels 3 & 4 are connected to L2

Channels 5 & 6 are connected to L3

1601 Jack McKay Blvd. • Ennis, Texas 75119 U.S.A.

Telephone: 800-321-6699 • Fax: 800-996-3821

– 7 –

ETAsys.com

Specifications are subject to change without notice.

Page 7
Image 7
ETA Systems eta-ecm2063 CONFIGURING THE ETA-ECM2063, Channel Control Ports, Channel Status Indicators, Load Distribution