Field Controls PVU-300 installation instructions

Models: PVU-300

1 16
Download 16 pages 61.77 Kb
Page 12
Image 12
Manual background

2.To vent two 24 VAC appliances using one PVU power venter refer to the following.

a.Follow the instructions for safe and proper venting previously specified in this manual. Make sure that the combined gross BTU/Hr input and equivalent vent pipe length does not exceed the maximum venting capacity of the venter selected.

b.A CK-41 Control Kit must be added to the system to properly control the venter when common venting an additional 24 VAC furnace or boiler. Tee the draft tube on the PVU unit to connect to the air pressure switch on the Control Kit. Refer to Diagram G for wiring instructions.

Diagram G – Multiple Wiring with two 24 VAC Appliances

Page 12

Page 12
Image 12
Field Controls PVU-300 installation instructions