Page 5 of | Page 5 of 29 |
3.Hardware Connections
The FieldServer is connected to the GE PLC in one of two ways.
Almost every GE PLC has a
A converter is required to connect between
|
| Cable 1 |
|
|
|
| |||
|
|
|
|
|
|
| 15 pin female |
| |
|
|
|
|
|
|
|
|
| |
FieldServer |
|
|
|
|
|
|
|
|
|
|
|
|
|
| C |
|
|
|
|
|
|
|
|
| a |
|
|
|
|
|
|
|
|
| bl |
|
|
| |
|
|
|
|
|
| e |
|
|
|
|
|
|
| 3 |
| 4 |
|
|
|
|
|
|
| le |
|
|
|
|
|
|
|
| b |
|
|
|
|
| |
|
|
| a |
|
|
|
|
|
|
|
|
| C |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
| Cable 2 |
|
|
| RJ11 |
| ||
|
|
|
|
|
|
| |||
Cable 1 |
|
|
|
|
|
|
| Pin 1 at bottom |
|
|
|
|
|
|
|
|
|
| |
FieldServer | GE |
|
|
|
|
|
|
| |
Tx + | 10 + | Tx |
|
|
|
|
|
| |
- | 11 - |
|
|
|
|
|
|
| |
Rx + | 12 + | Rx |
|
|
|
|
|
| |
- | 13 - |
|
|
|
|
|
|
| |
Gnd | 7 |
| Gnd |
|
|
|
|
|
|
Cable 2 |
|
|
|
|
|
|
|
|
|
FieldServer | GE |
|
|
|
|
| GE SNP |
| |
Tx | 5 | Rx |
|
|
|
|
| ||
Rx | 2 | Tx |
|
|
| CONNECTION DIAGRAM | |||
Gnd | 3 |
|
|
|
|
| |||
Gnd |
|
|
|
|
|
| |||
- | 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
* | 1 | CTS |
|
|
|
|
|
| |
| 6 | RTS |
|
|
|
|
|
| |
|
|
|
|
|
| BASE NAME: | DATE: 2/2/04 | ||
|
|
|
|
|
| FILE NAME: | BY: | MF | |
FieldServer Technologies 1991 Tarob Court Milpitas, California 95035 USA | Web:www.fieldServer.com | ||||||||
Tel: (408) | Toll_Free: | email: support@fieldServer.com |