Table of Contents
Contents | Page |
Safety Information | i |
Introduction | 1 |
Contacting Fluke | 2 |
Additional Information | 2 |
Configuring the 268XA | 3 |
Reviewing and Setting the Base Channel Number | 3 |
Reviewing and Setting the Line Frequency | 5 |
Reviewing and Setting the Network Type | 7 |
Reviewing and Setting the General Network Socket Port | 12 |
Reviewing and Setting the General Network IP Address | 13 |
Reviewing and Setting the Subnet Mask and Default Gateway | 14 |
Viewing the Device Ethernet Address | 16 |
Host Computer and Network Preparation | 18 |
Installing Host Computer Ethernet Adapter | 18 |
Device and Host Computer Interconnection | 20 |
Host Computer/Device Direct Connection | 20 |
Interconnection Using 10/100BaseT (Twisted Pair) Ethernet Wiring.. 20 | |
Installing Host Computer Networking Software | 22 |
Setting Host Computer Networking Parameters | 23 |
Introducing Fluke DAQ Software | 24 |
Installing Fluke DAQ Software | 24 |
Understanding the User Interface | 26 |
Using the Toolbar | 26 |
Understanding the Workspace Area | 28 |
Checking Operational Status | 29 |
Device Status Icon | 29 |
Module Status Icon | 29 |
Computed Channel Status Icon | 29 |
I/O Module 6 | 29 |
Configuration Dialogs | 30 |
Network Configuration Dialog | 30 |
Device Configuration Dialog | 30 |
vii