INSTALLATION

Wall drilling and bracket fixing

7.2.1

X 1÷2

11a

12a

11

 

362

200

200

11

180

180

960

 

 

2

 

2

250

On the wall, draw

a Vertical line up to the ceiling or upper limit, at the centre of the area in which the Hood is to be fitted;

a Horizontal line at a minimum of 960 mm above the Cooker Top.

Mark a point (1) on the horizontal line, 200 mm to the right of the vertical reference line.

Repeat this operation on the other side, checking that the two marks are level.

Mark a reference point (2) as indicated at 180 mm from the vertical reference line and 362 mm above the Cooker Top.

Repeat this operation on the other side, checking that the two marks are level.

Drill at the points (1) marked, using a ø 12 mm drill bit.

Drill at the points (2) marked, using a ø 8 mm drill bit.

Insert the bracket plugs 11a into the holes 1 and screw into place.

Insert plug 11 into hole 2.

Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit align- ing the centre (notch) with the vertical reference line.

Mark the wall at the centres of the holes in the bracket.

Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper chimney section supplied), aligning the centre (notch) with the vertical line.

Mark the wall at the centres of the holes in the bracket.

Drill ø 8 mm holes at all the centre points marked.

Insert the wall plugs 11 in the holes.

Fix the brackets using the 12a screws (4,2 x 44,4) supplied.

EN

 

1

 

18

Page 18
Image 18
Franke Consumer Products FQD 907 manual Installation, Wall drilling and bracket fixing