Friedrich BR1224W3A installation instructions Line set installation, Option 1 3” hole pass through

Models: BR1224W3A

1 8
Download 8 pages 551 b
Page 5
Image 5
STEP 4 - Line set installation

Option 2: Window Installation Using Friedrich SimpleSill™

1.Be sure window sill is clean and free of dirt and debris. With the window raised, place bottom seal gasket (trimmed to window width) firmly against window sill

(adhesive side down). Expand the SimpleSill™ 1” greater than the width of the win- dow and install the securing pin. Place one end of the SimpleSill™ into the window opening so it is against the corner of the window frame and sill. Raise the other side of the SimpleSill™ 6-9 inches (depending on window width) above the window sill. Next, press the raised side down until the SimpleSill™ is lodged securely into position. The SimpleSill™ end gaskets will conform to the window track shape.

2.Reference Step 4.2 and pass the connecting line out the window and insert it into the connecting line form in the SimpleSill™.

3.Install top seal gasket to the bottom of the window so it will seal against the top of the SimpleSill.

4.Replace the pass through cover.

5.Insert securing pins.

6.Lower window frame against SimpleSill compressing gasket.

7.Depending on the type of window, install the appropriate security lock as recom- mended by manufacturer.

STEP 4 - Line set installation

1.

4.

5.

The Breeze connecting line set contains copper tubing that may kink if bent or formed incorrectly or repeatedly. To avoid damaging your Breeze air conditioning system follow the 3 rules below throughout installation:

1)DO NOT uncoil and recoil the connecting line set more than two times.

2)DO NOT bend tubing in a radius smaller than 6”

3)ALWAYS use the tube bending guide when making bends greater than 45°

Following these instructions is critical for proper installation and to avoid damage to the unit. Damage to the connecting line due to improper installation will not be covered by the warranty.

4.1 Option 1 (3” hole pass through)

Completely uncoil the line set as straight as possible. Starting with the quick connect end of the line set, pass the entire length through the 3” hole. (Before installation break small plastic knockout on side of indoor unit for power cord to pass through-see Step 3, Figure 3.1).

4.2 Option 2 (SimpleSillwindow installation)

STEP 5

Uncoil enough of the line set to completely pass through the SimpleSill. Pre bend the line set using the enclosed template to match the desired shape as it passes through the SimpleSill. Place remaining coiled line set outside the window for later connection to the outdoor unit. Break full plastic knockout for line set to pass through the side of the indoor unit-see Step 3, Figure 3.2.

STEP 5 - Hang the indoor module on the wall bracket.

Hang the module at the top first and rotate it down until the module is level with the wall. (You may need to make adjustments to the connecting line to get the indoor module to mount cleanly) The Breeze module is not designed to mount totally flush to the wall. A space of 1/8” to 3/8” may be present between the module and the wall.

The line set will sit in the recess of the back of the indoor unit when mounted.

Page 5
Image 5
Friedrich BR1224W3A Line set installation, Option 1 3” hole pass through, Option 2 SimpleSill window installation