Friedrich YS09 operation manual Figure C, Figure D, Figure E

Models: YS09

1 56
Download 56 pages 23.15 Kb
Page 11
Image 11
NOTICE

920-198-01

STEP 8 OUTSIDE SUPPORT MOUNTING – Assemble the support brackets (Item #1) to the bottom rails of the cabinet with four

(4)10-24 1" long screws (Item #2) and four (4) 10-24 Àat nuts (Item #3). Adjust the support brackets to bring the bottom pads in contact with the wall surface. (A 1" x 4" or 2" x 4" SPACER SHOULD BE USED BET WEEN THE WALL AND THE SUPPORT BRACKETS WHEN INSTALLED ON ALUMINUM OR VINYL SIDING). Drill 5 »32" dia. pilot holes and secure the brackets to the wall with two (2) #12A x 2" long screws (Item #4). Adjust the support brackets to provide an approximate 3/8" down slope toward the outside for drainage. (See Figure D). Tighten all screws.

NOTICE

Instructions for mounting sleeve with slope must be observed to prevent entry of water into room.

NOTE: The discharge air, return air, condenser air inlets and outlets must be unobstructed to avoid recirculation of rejected heated air.

Figure C

 

 

TOP

CENTER

SUPPORT

CABINET IN

ANGLE

WINDOW SIDE

PULL

TO SIDE.

WINDOW

 

 

5

 

SASH DOWN

32

BEHIND TOP

DRILL (3)

» "

PILOT HOLES

SUPPORT

AND INSTALL

ANGLE

(3) #12A x

 

2" LONG

SIDE

SCREWS

SUPPORT

(ITEM #4)

ANGLE

WINDOW

SILL

LOCATE SILL PLATE GUIDE CHANNEL

JUST BACK OF WINDOW SILL

The following illustrations show a standard frame construction installation as well as some suggested ways of adapting the support bracket to thick walls and large stone ledges.

Figure D

Figure C" DOWN SLOPE

SUPPORT BRACKET (ITEM #1)

#12A x 2" SCREW

(ITEM #4)

1" x 4" OR 2" x 4" SPACER SHOULD BE USED BETWEEN WALLAND BRACKET WHEN INSTALLED ON ALUMINUM, ASBESTOS OR VINYL SIDING

SUPPORT

BRACKET

10 – 24 FLAT WELD NUT (ITEM #3)

10 – 24 x 1" HEX HD. SCREW (ITEM #2)

Figure E

NOTE: It is not necessary to cut the wingboard for vertical height; only horizontal WIDTH Dimension “B”.

MEASURE DISTANCE "B" TO INSIDE OF THE CHANNEL ON EACH SIDE

CUT HERE AND DISCARD CENTER WASTE MATERIAL.

WINGBOARD

SUBTRACT Figure D" FROM DIMENSION "B" AND MEASURE FROM THE EDGE OF THE WING- BOARD (ITEM # 8), MARK, SCORE AND CUT WITH APPROPPRIATE CUTTING TOOL

11

Page 11
Image 11
Friedrich YS09 operation manual Figure C, Figure D, Figure E