Friedrich ZQ10 A10B manual 3.5PREPARING THE UNIT FOR INSTALLATION, Before Installation

Models: ZQ10 A10B

1 28
Download 28 pages 45.5 Kb
Page 14
Image 14
3.5PREPARING THE UNIT FOR INSTALLATION

3.5PREPARING THE UNIT FOR INSTALLATION

Remove the 2 shipping screws from the back of the

case.

Remove the 2 screws on each side of the case. Keep these for later use.

Slide the air conditioner from the case by gripping

the base pan handle and pulling forward while bracing the case.

3.6 BEFORE INSTALLATION...

Cut the window sash seal to the proper length. Peel off the backing and attach the seal to the underside of the window sash.

Window sash seal

Carefully insert the plastic frame guides into the

bottom of the case on each side.

Bottom of

When the frame guides are set, the arrows should becase pointing toward the back end of the unit.

Insert the frames for the frame curtains into the top

mounting rail and the frame guides. Attach the frame curtains to the side of the case using 4 type A screws

(Type A)

Shipping screws

3.6 BEFORE INSTALLATION... Frame guide

(Type A)

— 14—

Page 14
Image 14
Friedrich ZQ10 A10B manual 3.5PREPARING THE UNIT FOR INSTALLATION, Before Installation