Frymaster FPHD65 Assembling the Filter, Suff/Uff Filtration Systems, Installation And Operation

Models: FPHD65

1 52
Download 52 pages 52.96 Kb
Page 34
Image 34
6.2.2 Assembling the Filter

SUFF/UFF FILTRATION SYSTEMS

CHAPTER 6: INSTALLATION AND OPERATION

6.2.2 Assembling the Filter

FILTER PAPER AND HOLD DOWN RING

1.Place the support grid in the bottom of filter pan.

2.Put one filter paper sheet on top of the support grid. Be sure the paper covers the filter pan bottom and laps two inches onto the pan wall.

3.Position the hold-down ring on top of the filter paper. Ensure the hold-down ring seals around the support grid. This prevents air from getting into the system.

Support grid properly placed in filter pan.

Ensure filter paper overlaps two inches on all sides and is evenly distributed under the hold- down ring.

Hold-down ring positioned correctly over filter paper in filter pan.

6-4

Page 34
Image 34
Frymaster FPHD65 operation manual Assembling the Filter, Suff/Uff Filtration Systems, Installation And Operation