6SPARC Enterprise M8000/M9000 Servers Product Notes for XCP Version 1060 • February 2008
Hardware Installation and Service IssuesThis section describes hardware specific issues and workarounds.
Notes for power-on after power-off
Please wait at least 30 seconds before turning on the system power that you turned
off, by using the main line switch or the circuit breakers on the distribution panel.
Specific Issues and Workarounds
TABLE1 lists known hardware issues and possible workarounds.
TABLE1 Hardware Issues and Workarou nds
CR ID Description Workaround
6433420 The domain console might display a Mailbox
timeout or IOCB interrupt timeout error during
boot.
Issue a reset -all command from the
OpenBoot PROM (OK) prompt and reboot.
6488846 During boot, the domain console might display
a checksum error for the SG(X)PCI2SCSIU320-
Z SCSI controller I/O card.
Check for the availability of the latest
controller card firmw are.
6557379 Power cables are not redundant on single
power feed servers without the dual power
feed option.
On servers that have single power feed, all
power cables must be connected and powered
on at all times.