4. INCORPORATION OF DGPS BEACON RECEIVER KIT (for GP-1650W)

Installation of beacon receiver

Procedure

1. Disconnect 8P connector as shown in the figure below.

Chassis assembly

A

Connector

A View

PH8P

 

J106

 

Panel assembly

Dismounting chassis assembly

2.Dismount chassis assembly from panel assembly by disconnecting connector shown in the figure above.

3.Cut the cable ties as shown in the figure below.

ANLG board

Cut cable tie.

J8

GN-8091

Cut cable tie.

Cutting cable ties

16

Page 24
Image 24
Furuno GP-1650WD installation manual Dismounting chassis assembly, Cutting cable ties