Magnum 6K25 Managed Fiber Switch

Installation and User Guide (04/06)

Magnum6K25QS5116

 

1

3

5

7

 

1

3

5

 

7

 

1

3

5

7

10/100

 

 

 

LK

10/100

 

 

 

 

LK

10/100

 

 

 

LK

ManagedFiberSwitchFiber

 

 

 

 

ACT8

 

 

 

 

 

 

F/ H

 

 

 

ACT8

Switch

F/ H

2

4

6

F/H

 

 

ACT

 

ACT

2

4

6

 

10/100

 

 

 

LK

ACT

 

 

 

 

10/100

 

 

 

LK

 

 

 

 

 

 

F/H

 

 

F/H

 

 

 

 

 

 

 

 

F/H

 

 

 

ACT

2

TX LK

RX

TX6

LK

RX

F/H

 

 

 

ACT

1000Mb Data Mining Servers

Internet

Magnum DS8016 StackableX Hub1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

 

 

 

 

 

 

100Mb Servers

and Workstations

Magnum DS8016 StackableX Hub1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

 

 

 

 

 

 

100Mb Servers

and Workstations

Magnum DS8016 StackableX Hub1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Router

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

100Mbps Full

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

duplex Fiber for

 

 

 

 

12

13

 

14

15

16

 

 

 

 

 

 

 

another Bldg.

Magnum DS8016 StackableX Hub1

2

 

3

4

 

5

6

7

8

9

10

11

 

100Mb Servers

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and Workstations

 

 

 

 

 

 

 

 

 

 

 

 

Magnum DS8016 StackableX Hub1

2

3

4

 

5

6

7

 

8

9

10

11

 

 

 

 

 

12

13

14

15

16

 

 

 

 

 

 

 

 

 

 

 

 

 

100Mb Servers and Workstations

10Mb Workgroup

3.0Installation

Before installing the equipment, it is necessary to take the following precautions:

1.) If the equipment is mounted in an enclosed or multiple rack assembly, the environmental temperature around the equipment must be less than or equal to 500C.

2.) If the equipment is mounted in an enclosed or multiple rack assembly, adequate airflow must be maintained for proper and safe operation.

3.) If the equipment is mounted in an enclosed or multiple rack system, placement of the equipment must not overload or load unevenly the rack system.

4.) If the equipment is mounted in an enclosed or multiple rack assembly, verify the equipment’s power requirements to prevent overloading of the building/s electrical circuits.

5.) If the equipment is mounted in an enclosed or multiple rack assembly verify that the equipment has a reliable and uncompromised earthing path.

6.) 24vdc, -48vdc, and 125vdc must be installed in restricted access locations.

7.) CB-Circuit breakers of 10Amps should be shown on top of the Rack.

This section describes installation of the Magnum 6K25 Switches, as well as connection of the various Ethernet media types.

3.1Locating Magnum 6K25 Switches

The location of a Magnum 6K25 Switch is dependent on the physical layout of

the network. Typically the Switch is placed in a central wiring location where groups of network devices need to be connected in order to communicate with each other. These

www . GarrettCom . com

21

Page 28
Image 28
GarrettCom manual Installation, Locating Magnum 6K25 Switches