Magnum 6K25 Managed Fiber Switch | Installation and User Guide (04/06) |
and the PoE LED is OFF. No power is being sent out from the port.
•The PoE ports in Magnum 6K’s with 48VDC power input act as a pass- through, so the 48VDC power source must be strong enough to provide power to the 6K switch and to all the 8
•In the case where the 48VDC power in not internally connected and no power is coming to the PoE ports for some reason, all the PoE port LEDs are ON simultaneously to indicate a trouble condition. The ports will still operate properly for data traffic.
5.2.12
The Magnum 6KP8-
MTRJ type ports. The small sizes of MTRJ connectors give an advantage of placing more fiber ports on one module. The
| |||
6 Port@10/10Mbps | & 2 port @100Mb |
| |
| |||
| 2 |
|
|
1 | 3 | 5 | 1 |
10/10 |
| L |
|
4 |
|
|
|
| AC |
|
F/H |
|
|
|
|
|
|
10/100 |
|
|
|
| ACT |
|
|
|
|
| F/H |
| |
|
|
|
|
|
| |
|
|
|
|
| ACT |
|
F/H | 2 | 4 | LK | 6 | F/H | 3 |
| ||||||
|
|
|
|
|
|
1 | LINK | 2 10/100 |
3 ACTIVITY 4 FULL/HALF
installed in a Magnum 6K25 Switch, it supports the on 5.2.3. and the LEDs also act similarly.
5.2.12a
The Magnum 6KP8- 45SLC eight port Module is a combo module with copper and fiber (Small Form Factor) LC type fiber ports.
The small size of LC connectors give an advantage of placing more ports on one module. The 6KP8-
6KP8V-
6 Port@ 10/100Mbps & 2 port @ 100Mbps
| 1 | 3 | 5 |
| 1 |
10/10 |
|
|
| L |
|
4 |
|
|
|
| |
|
|
| AC |
| |
F/H |
|
|
|
|
|
10/100 |
|
|
| ACT |
|
|
|
| F/H |
| |
|
|
|
|
| |
|
|
|
| ACT |
|
F/H | 2 | 4 | LK | F/H | 3 |
6 | |||||
|
|
|
|
|
1 | LINK | 2 | 10/100 |
3 | ACTIVITY | 4 | FULL/HALF |
www . GarrettCom . com
51