GE 164D4290P393 Cut Holes, Run Wires, Screw In Partway, OPTIONAL POWER CORD KIT JXHC1

Models: 164D4290P393

1 20
Download 20 pages 23.63 Kb
Page 14
Image 14
11FOR RECESSED-BOTTOM CABINETS ONLY

Installation Instructions

11FOR RECESSED-BOTTOM CABINETS ONLY

Wood shims

If the cabinets have front, side or back trim, make

2 wood shims the width of the trim and attach them to the cabinet bottom recess on both sides. See Step 10 for marking locations.

12CUT HOLES

Cut holes at marked locations for duct and electrical wiring. For the vertical duct, cut out 3/4″ extra toward the front of the cabinet so you can move the duct freely when installing the hood. It may also ease installation by cutting the hole 1012″ instead of 10″.

13RUN WIRES

Run the electrical wires through the wall or cabinet according to National Electrical Code and applicable local codes.

NOTE: DO NOT turn the power on until installation is complete.

14SCREW IN PARTWAY

Drive a mounting screw (from the hardware packet) partway into each center of the narrow neck of the keyhole slots marked on the cabinet bottom.

15OPTIONAL POWER CORD KIT JXHC1

An optional Power Cord Connection Kit, model JXHC1, is available at extra cost from your GE supplier for installation using a standard 3-prong, grounded wall outlet. Follow the Installation Instructions packed with the kit to connect the power cord to the range hood.

C

Cabinet

 

L

 

 

 

3-prong

734

 

wall outlet

114

(if using cord

 

connection)

134dia. clearance hole for optional power supply location

NOTE: If using optional Power Cord Kit JXHC1, feed the power cord through the hole in the top cabinet while raising the hood. Loop any excess length of cord and tie away with a suitable tape or tie.

16FEED IN WIRES

Lift the hood into position and feed the house wiring through the wiring knockout.

14

Page 14
Image 14
GE 164D4290P393 Cut Holes, Run Wires, Screw In Partway, OPTIONAL POWER CORD KIT JXHC1, Feed In Wires