Installation Instructions

DAMAGE – SHIPMENT/INSTALLATION

If the unit is damaged in shipment, return the unit to the store in which it was bought for repair or replacement.

If the unit is damaged by the customer, repair or replacement is the responsibility of the customer.

If the unit is damaged by the installer (if other than the customer), repair or replacement must be made by arrangement between customer and installer.

MOUNTING SPACE

Bottom edge of

 

 

cabinet needs

 

 

to be 30or

 

 

more from

 

 

the cooking

 

 

surface

30or

36

30

 

min.

 

 

66or more from the floor to the top of the hood

NOTES:

This range hood is for installation over ranges or cooktops up to 36″ wide.

If you are going to vent your range hood to the outside, see the “Ducting Requirements” section for exhaust duct preparation.

TOOLS YOU WILL NEED

 

Flat blade and Phillips

Pencil

 

screwdrivers

 

Duct tape

Saw (saber or keyhole)

Electric drill

Metal snips

 

 

 

(in some

 

 

 

applications)

1/4pivoting

Pliers

Tape measure

Wire stripper

hex socket

 

 

 

Flashlight

Caulking

Level

1/4Nutdriver

PARTS INCLUDED

PART

QUANTITY

Grease Filter only (JV338)

1

Charcoal Filter only

1

(JN327 and RN328)

 

Grease Filter and Charcoal

2

Filter (JV347 and JV367)

 

Mounting Screws

4

Exhaust Adaptor

1

(for 314x 10rect. venting)

 

Exhaust Adaptor Screw

1

9

Page 9
Image 9
GE 164D4290P393 installation instructions Damage SHIPMENT/INSTALLATION, Mounting Space, Tools YOU will Need, Parts Included