6.Connect service ground wire(s) to grounding lug(s) provided. One ground is required for each supply circuit used.
WARNING:
To avoid personal injury or property damage, make certain that the motor leads cannot come into contact with
Blower Installation:
1.Turn off all electrical supply circuits to the furnace at the main service panel.
2.Remove furnace front door and switch furnace circuit breaker(s) to “OFF”.
3.Disconnect the motor plug from the control panel receptacle.
4.Remove one screw from left side of blower and three screws from right side of blower; slide blower forward and remove.
5.Install new blower ensuring the side fl anges engage under side mounting tabs (three on one side, one on the other) and the long tab in the rear.
6.Replace screws previously removed from blower.
7.Connect the motor plug to the control panel receptacle.
8.Switch circuit breaker(s) to “ON”, reinstall furnace front door, and turn on electrical supply circuits to the furnace.
Selecting Blower Speed
See Table 5 for the lowest speed approved for the heating output of the unit. Since the blower leads connect to the control box, blower speed selection is accomplished through use of the proper
Circuit
Breaker
Wire
Assemblies
(Factory
Installed)
Circuit Breaker
Bracket
OFF | 60A | ON |
OFF | 60A | ON |
Optional
Single Circuit
Adaptor Kit
Supply Service
Wire Connection
With Single Circuit
Adaptor Kit
Figure 20. Installation of Optional Single Circuit Adaptor Kit
Circuit
Breaker
Wire
Assemblies
(Factory
Installed)
Circuit Breaker
Bracket
OFF | 60A | ON |
OFF | 60A | ON |
Supply Service Wire Connection
Without Single
Circuit Adaptor Kit
Figure 21. Installation of Supply Service Wires
19