Preparing Floor Opening(s)

Preparing Floor Opening(s)

1.Mark fl oor opening(s) as shown in Figure 6. Provide minimum clearances at rear and right side walls of closet or alcove for installation of furnace and wiring.

2.Cut floor opening on outside edge of marked line so that opening is slightly larger than area marked.

3.Additional provisions may be necessary for optional air conditioning or heat pump if refrigerant lines are installed elsewhere than at the front of the furnace.

4.The refrigerant and entrance supply opening dimensions may be adjusted ± 1/2”.

Installing Duct Connector

NOTE: The duct connector is designed for use on ducts down to 12” wide. On typical ducts, the fi nger tab duct connector may be installed using Method B. On narrow ducts, there may be insuffi cient clearance to bend the tabs on two sides of the fi nger tab duct connector. In such

 

 

If "X"

Use Duct Connector

 

floor cavity is:

Model Part Number

English

Metric

Finger

Screw

(mm)

Tab

Down

 

 

 

7/8"

 

22

901987

904008

 

2"

 

51

901988

904009

4

1/4"

 

108

901989

904010

6

1/4"

 

159

901990

904011

8

1/4"

 

210

901991

904012

10 1/4"

 

260

901992

904013

12 1/4"

 

311

901993

904014

Table 4. Floor Cavity Sizes

cases, use Method C or D. For screw down duct connector use method E. For Platinum models always use method A.

Method A - Platinum Series

NOTE: Flex duct used must have a minimum temperature rating of 200° F and meet all other applicable codes and standards.

1.Place duct connector through opening in fl oor. See Figure 9.

2.Connect 14” supply duct.

 

REAR WALL OF ENCLOSURE

 

 

Center Line

 

2-3/8" MIN

 

 

 

 

(60 mm)

 

 

 

 

 

 

 

 

Furnace

 

 

14-1/2"

 

Outline

 

 

 

 

 

 

(368 mm)

 

 

17"

 

 

14-1/2"

 

(432 mm)

 

 

 

 

 

(368 mm)

 

 

 

 

16-5/8"

23-3/4"

 

 

 

 

 

 

(422 mm)

(603 mm)

 

 

 

 

 

Optional Supply Wire

 

 

 

Entrance

 

 

3-3/4"

 

A/C Or HP

 

3" (76 mm)

(Not required

 

 

Optional

 

 

(95 mm)

 

 

for Platinum)

 

 

 

Refrigerant

 

 

 

 

Line

 

 

3/4"

4-1/4"

5"

3-3/8"

 

(19 mm)

 

(108 mm)

(127 mm)

(86 mm)

 

 

 

Furnace Outer

 

10"

 

6-1/4"

Door

(254 mm)

20"

(159 mm)

 

 

 

 

 

 

(508 mm)

 

Figure 6. Downflow Floor Cutout Locations (nominal dimensions)

11

Page 11
Image 11
Nordyne E3 user service Preparing Floor Openings, Installing Duct Connector, Floor Cavity Sizes, Method A - Platinum Series