GE DEH-211 manual

Models: DEH-211

1 69
Download 69 pages 4 Kb
Page 29
Image 29
8.If you did not select “PMCS with EPM 7700 Components” in the Setup Type dialog box (Step 7), skip this step and proceed to Step 11.

8.If you did not select “PMCS with EPM 7700 Components” in the Setup Type dialog box (Step 7), skip this step and proceed to Step 11.

If you are installing the EPM 7700 Components, select whether this is to be a Primary node installation or Secondary node installation. You must install at least one Primary node on your PMCS network; it is recommended that you install the Primary node at the same machine as the PMCS DDE Server for convenience in configuration. Secondary nodes are akin to PMCS view nodes and may be installed on remote machines to access EPM 7700 data from the Primary node. (For additional details on Primary and Secondary nodes, see the section on configuring EPM 7700 components later in this chapter.)

CIMPLICITY PMCS Read-This-Book-First

Installing the Software 27

Page 29
Image 29
GE DEH-211 manual