ASTAT ®-IBP Plus Service Instructions
7.Reconnect the red and white gate wires to the four- point Terminal Boards, one on the component side and two on the solder side of the Power Supply Board, as illustrated in Figures 8, 9, and 10.
8.Secure the Power Supply Board with the four screws removed earlier.
9.Reinstall the following components:
a. The Logic Board, as described in steps
d. The cover, as described in steps
Figure 8. Gate lead connections for sizes K, L, and Y.
Figure 9. Gate lead connections for sizes M, Z, and N.
Figure 10. Gate lead connections for sizes P, Q, R, and S.
4 | Prices and data subject to change without notice. |