GE GE 31-30263 05-10 Installation Preparation, Parts Supplied, Materials You Will Need

Models: GE 31-30263 05-10

1 24
Download 24 pages 34.35 Kb
Page 2
Image 2
Installation Preparation

Installation Preparation

PARTS SUPPLIED:

† Two #8 Phillips flat head wood screws, 5/8”long to secure dishwasher to underside of countertop

(in literature package).

2 Wood Screws

MATERIALS YOU WILL NEED:

†Ferrule, compression nut and 90° Elbow (3/8”NPT external thread on one end, opposite end sized to fit water supply)

†Thread seal tape

†UL Listed wire nuts (3)

 

 

Wire Nuts (3)

90° Elbow,

Hand

Thread

Ferrule and

Shut-Off

Seal Tape

Compression Nut

Valve

 

Materials For New Installations Only:

†Air gap for drain hose, if required

†Waste tee for house plumbing, if applicable

†Electrical cable or power cord, if applicable

†Screw type hose clamps

†Strain relief for electrical connection.

†Hand shut-off valve

†Water line 3/8”min. copper

†Coupler for extending drain line, if applicable

Waste Tee

Hot Water line

 

Electrical Cable

(or Power Cord, if applicable)

Strain Relief

Air Gap

Screw Type

Hose Clamps

 

Coupler

TOOLS YOU WILL NEED:

†Phillips head screwdriver

†

5/16”and 1/4”nutdriver

Phillips head

5/16”and

†

6” Adjustable wrench

screwdriver

1/4”nutdriver

†Level

†

Carpenters square

 

†

Measuring tape

Safety glasses

†

Safety glasses

Measuring tape

 

 

†Flashlight

†Bucket to catch water when flushing the line

†Gloves

Level

6” Adjustable

wrench

Carpenters PARTS SUPPLIED:MATERIALS YOU WILL NEED:

square

Flashlight

For New Installations Only:

Bucket

 

† Tubing cutter

Gloves

 

†Drill and appropriate bits

† Hole saw set

Tubing cutter

Drill and Bits

Hole saw set

 

 

 

2

Page 2
Image 2
GE GE 31-30263 05-10 Installation Preparation, Parts Supplied, Materials You Will Need, Tools You Will Need