GE GTL21, GTH21 installation instructions Water Valve Installed, Attach Warranty Label

Models: GTH21 GTL21

1 108
Download 108 pages 7.11 Kb
Page 16
Image 16
WATER VALVE INSTALLED

Installation Instructions

ICEMAKER INSTALLATION INSTRUCTIONS (CONT.)

14

WATER VALVE INSTALLED

Refer to the Water Line Installation Instructions for connection to the home water supply. After water line installation is completed, set the icemaker power switch to I (on).

The icemaking cycle will not begin until the icemaker and freezer compartment reach operating temperature, then icemaking will begin automatically.

15

ATTACH WARRANTY LABEL

A label is provided with this kit to record the date of installation for warranty purposes. Apply it to the back of the refrigerator. The icemaker installation inside the freezer is now complete.

16

Page 16
Image 16
GE GTL21 Water Valve Installed, Attach Warranty Label, Installation Instructions ICEMAKER INSTALLATION INSTRUCTIONS CONT