INSTALLATION INSTRUCTIONS

STEP 4

3 WIRE POWER CORD INSTALLATION

Remove the 3 wire terminal screws from the connector block. Insert screws through each power cord terminal ring and into the connector block until the screws engage the

nuts. Be certain that the center wire is connected to the center screw of the connector block. Tighten screws securely. Do NOT remove ground strap connection.

CONNECTOR

NEUTK TERM

D

POWER

W_ING: THE NEUTRAL OR GROUND WIRE OF THE POWER CORD MUST BE CONNEC133D TO THE NEUTRAL TERMINAL LOCA’T’ED IN THE CENTER OF THE CONNECTOR BLOCIL THE POWER LEADS MUST BE CONNECTED TO THE OUTSIDE (BRASS COLORED) TERMINALS.

4 WIRE POWER CORD INSTALLATION

A. Remove the 3 screws from the connector block.

B. Remove the grounding screw and strap from the connector block middle location and the screw connection to the frame of the range.

BEFORE

NEUTRAL

TERMINAL

;ROUNDING STRAP ‘ GROUNDING TO RANGE)

C. Insert screws through each power cord terminal ring and into connector block until screw engages nut. Be certain that the center wire is connected to the center screw of the connector block. Tighten screws securely.

D. Attach ground wire to the frame of the range.

AFTER

W-ING: THE NEUTRAL WIRE OF SUPPLY CIRCUIT IS CONNECTED TO THE NEUTRAL TERMINAL LOCATED IN THE CENTER OF THE CONNECTOR BLOCK. THE POWER LEADS MUST BE CONNECTED TO THE OUTSIDE (BRASS COLORED) TERMINALS. THE 4TH GROUNDING LEAD MUST BE CONNECTED TO THE FRAME OF THE RANGE WITH THE GROUNDING SCREW.

(continued next page)

32

Page 32
Image 32
GE JBW3-4 warranty Installation Instructions, Step Wire Power Cord Installation