GE JGSP28 Installation Instructions PRE-INSTALLATION CHECKLIST CONT, Standard Installation

Models: JGSP28

1 16
Download 16 pages 60.38 Kb
Page 6
Image 6
Installation Instructions

Installation Instructions

PRE-INSTALLATION CHECKLIST (CONT.)

8 PRE-INSTALLATION CUTOUT AND REQUIRED CLEARANCES

If cabinets are placed less than 30above the range, see Alternate Construction, Step 19F, on page 16.

NOTE: Product meets ANSI Z21.1 requirements for 0clearance to back and side walls below the cooktop.

Wall coverings, counters and cabinets around range must withstand heat (up to 194°F) generated by the range.

Follow instructions

packaged with8 PRE-INSTALLATION CUTOUT AND REQUIRED CLEARANCES 30” min. alternate appliance

6” min. from walls

 

 

 

For optimum

 

30” min. from

 

 

24” min.

cooking surface

 

 

installation these

 

to bottom of

 

 

surfaces must be

 

overhead

 

 

flat and level

23-3/16”

cabinets

13” max. 18” min. vertical distance

 

 

 

 

 

depth

from the bottom of the

 

 

 

 

adjacent overhead cabinets

35-7/8”–38” from floor to countertop

Max. depth of cord, plug, recept. box &

gas hookup 4” to prevent interference

with drawer

2-1/2”

Acceptable 9 STANDARD INSTALLATIONManual background 25” gas line and electrical

outlet area

29-15/16” min.

30-1/16” max.

Countertop depth 25” (typical)

Manual background 1-1/4” min. countertop Manual background to top of drawer

7-1/2”

2-1/2”

9 STANDARD INSTALLATION

If the construction of your cabinet cannot provide a 1/4flat area at the back of the countertop opening, consider changing the countertop to accommodate this dimension. See Alternate Construction section.

Wall

* 1-13/16

 

 

1/4min.

 

Flat area

 

R

flat

 

25

 

 

 

23-3/16

typically

36

9/16

9/16

 

min.

min.

1/4

flat

flat

 

Manual background 29-15/16–30-1/16Manual background smooth cut

*NOTE: A 1-1/2minimum space must be maintained between the rear edge of the cooktop and the rear wall above the cooktop.

6

Page 6
Image 6
GE JGSP28 Installation Instructions PRE-INSTALLATION CHECKLIST CONT, Pre-Installation Cutout And Required Clearances