GE PVB94, PVB98, PVB37, PVB67 Safety Information, Before You Begin, Completion Time - 1 to 3 hours

Models: PVB67 PVB94 PVB37 PVB98

1 32
Download 32 pages 23.19 Kb
Page 2
Image 2
Safety Information

Safety Information

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT – Save these instructions for local inspector’s use.

IMPORTANT – Observe all governing codes and ordinances.

Note to Installer Be sure to leave these instructions with the consumer.

Note to Consumer Keep these instructions for future reference.

Skill Level Installation of these vents require basic mechanical and electrical skills.

Completion Time – 1 to 3 hours.

Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the warranty.

If you received a damaged vent, you should immediately contact your dealer or builder.

For Monogram local service in your area, 1.800.444.1845.

For Monogram service in Canada, 1.800.561.3344.

For Monogram Parts and Accessories, call 1.800.626.2002.

BEFORE YOU BEGIN WARNING:

This appliance must be properly grounded.

WARNING:

TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.

Read these instructions completely and carefully. WARNING: To reduce the risk of fire, electric shock or injury to persons, observe the following.

A. Use this unit only in the manner intended by the manufacturer. If you have questions, contact the manufacturer.

B. Before service or cleaning unit, switch power off at service panel and lock the service disconnecting means to prevent power from being switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.

Do not attempt to repair or replace any part

of the downdraft system unless it is specifically recommended in this book. All other servicing should be performed by a qualified technician.

For general ventilating use only. Do not use to exhaust hazardous or explosive materials and vapors.

Installation work and electrical wiring must

be done by a qualified person(s), in accordance with all applicable codes and standards including fire-rated construction.

•Completion Time – 1 to 3 hours. CAUTION: To reduce the risk of fire and to properly exhaust air, be sure to duct air outdoors. Do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces or garages.

2

Page 2
Image 2
GE PVB94 Safety Information, Before You Begin, Completion Time - 1 to 3 hours, For Monogram local service in your area