Installation Preparation

CLEARANCES

CAUTION: Wall coverings, countertops and cabinets should withstand 200° heat generated by any cooktop.

13"

Max.

30" Min. 18"

Min.

 

2" Min. to

2" Min. to

Wall When

Installed

Wall When

 

Installed

 

Electric Cooktop Clearances When Installed

Gas - 6" to 12"

Electric - 2"

Clearance to Side Walls

13"

Max.

30" Min. 18"

Min.

 

6" or 12" Min.

6" or 12" Min.

to Wall When

Installed

to Wall When

 

Installed

 

Gas Cooktop Clearances When Installed

PARTS SUPPLIED

Open the carton and remove parts package. Check contents to be sure all pieces are present.

2 Stabilizing Brackets

With Screws

1 Switch Cover Plate (With selected models)

1 Wire and White Connector

(With selected models)

TOOLS AND MATERIALS REQUIRED

Large flat-blade screwdriver

Jigsaw

Carpenter’s square

Ductwork to suit the installation

REMOVE PACKAGING

Remove the shipping materials and the carton; set carton aside. The carton can be used as a pad when changing or adjusting vent direction.

7

Page 7
Image 7
GE PVB67, PVB98, PVB37, PVB94 Clearances, Parts Supplied, Tools and Materials Required, Remove Packaging