GE PVB94, PVB98, PVB37, PVB67 Installation Preparation, Cutouts And Clearances, Cooktop/Downdraft

Models: PVB67 PVB94 PVB37 PVB98

1 32
Download 32 pages 23.19 Kb
Page 6
Image 6
Installation Preparation

Installation Preparation

CUTOUTS AND CLEARANCES

Measure carefully when cutting the countertop.

Make sure sides of the opening are parallel and rear and front cuts are exactly perpendicular to the sides.

Measure to be sure there is room for clearances to the front edge of the countertop.

Refer to cooktop installation instructions to be sure that models fit into the base cabinets being used.

Draw lines on the countertop to follow as

a cutting guide. Measure and mark cooktop and vent overlaps to be sure there is enough flat countertop depth.

30" COOKTOP/DOWNDRAFT

The cooktop must be installed per manufacturer’s installation instructions.

IMPORTANT: The countertop cutout requires 23-1/2" minimum flat countertop surface and 25" minimum total countertop depth.

CUTOUTS AND CLEARANCES 8-1/2"

2-1/8"*

30"

*Includes 1/8" gap between cooktop and vent trim

NOTE: Before you begin, measure and mark depth to ensure that adequate flat countertop surface is available.

Draw lines on the countertop to follow as a cutting guide.

Make sure sides of the opening are parallel

and rear and front cuts are exactly perpendicular (right angle) to sides.

36" COOKTOP/DOWNDRAFT

IMPORTANT: The countertop cutout requires 23-1/2" minimum flat countertop surface and 25" minimum total countertop depth.

NOTE: Before you begin, measure and mark depth to ensure that adequate flat countertop surface is available.

Draw lines on the countertop to follow as a cutting guide.

Make sure sides of the opening are parallel

and rear and front cuts are exactly perpendicular (right angle) to sides.

3/8" Minimum flat countertop

 

behind cutout required

2-1/2" Minimum**

28-1/2"

 

22-3/8"

 

**Required to maintain UL or CSA approvals

30" COOKTOP/DOWNDRAFT 8-1/2"

2-1/8"*

36"

*Includes 1/8" gap between cooktop and vent trim

3/8" Minimum flat countertop

 

behind cutout required

2-1/2" Minimum**

34"

 

21-7/8"

 

**Required to maintain UL or CSA approvals

6

Page 6
Image 6
GE PVB94, PVB98, PVB37, PVB67 installation instructions Installation Preparation, Cutouts And Clearances, Cooktop/Downdraft