GE ZET1, ZET2 installation instructions Pre-Installation Checklist, Installation Instructions

Models: ZET1 ZET2

1 16
Download 16 pages 37.56 Kb
Page 3
Image 3
 Pre-Installation Checklist

Installation Instructions

Manual backgroundManual background Pre-Installation Checklist

ALL INSTALLATION INFORMATION ON THE FOLLOWING PAGES IS TO BE USED FOR SINGLE AND DOUBLE OVEN INSTALLATION!

Remove packaging materials. Check behind hinges and under false bottom. Remove labels on the outside of the door, plastic on trims and panel, all tape around the oven, and any shipping screws securing the oven to the base pad.

Open oven door and remove literature pack, broiler pan and grid, oven racks, rack supports and a bag with 9 hex nuts.

Read Installation Instructions carefully before you begin.

Be sure to place all literature, Owner’s Manual, Installations, etc. in a safe place for future reference.

Rack Supports with Hex Nuts

Temperature

Oven Racks

Probe

Broiler Pan and Grid

EASY EASY INSTALLATIONINSTALLATION30"OF YOUR NEW

30" WALLWALLOVENOF YOUR OVEN NEW

Graphite

Lubricant

Literature

Pack

(Continued on following page)

3

Page 3
Image 3
GE ZET1, ZET2 installation instructions Pre-Installation Checklist, Installation Instructions