GE ZET2 Cabinetry, A6 Cutout for Frameless Cabinets, Single Oven Cutout, for Installation Over

Models: ZET1 ZET2

1 16
Download 16 pages 37.56 Kb
Page 8
Image 8
Cabinetry

Cabinetry

A4

Single Oven Cutout

A5

 

for Installation Over

 

 

 

 

 

 

a Monogram Warming

 

 

Drawer

23 1/2

 

 

(59.7 cm)

 

Min.

Inside

Double Oven Cutout for Installation Over a Monogram Warming

Drawer 23 1/2

(59.7 cm) Min. Inside Single Oven Cutout

275/16

(69.2 cm) Max.

9(22.9 cm)

Max.

91/4

(23.5 cm).

281/2

(72.4 cm).

2x 2(5 cm x 5 cm) or 2x 4(5 cm x 10 cm)

Anti-Tip Block Against Rear Wall, 9(22.9 cm)

From Floor to Bottom of Block

2(5.1 cm)

NOTE: Install the

Min.

Allow 5/8

oven only with

specific models

(1.5 cm)

listed on the label

Overlap

located on top of

on All

the oven.

Sides

 

 

 

 

 

 

 

2x 2(5 cm x

 

 

 

 

 

 

 

5 cm) or 2x

 

 

 

 

 

 

 

4(5 cm x 10

 

 

 

 

 

 

 

cm) Anti-Tip

 

 

 

 

 

 

 

Block Against

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rear Wall, 9

 

 

 

 

 

 

 

(22.9 cm)

51 15/16

 

 

 

From Floor

 

 

 

to Bottom

(131.8 cm)

 

 

 

 

 

 

of Block

Max.

 

 

 

 

 

 

 

 

 

 

2(5.1 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9(22.9 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9 1/4

 

Allow 5/8

Max.

 

 

 

 

 

 

 

(23.5 cm).

 

(1.5 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

Overlap

 

 

 

 

 

 

 

on All

 

 

 

 

 

28 1/2

Sides

 

 

 

 

 

 

 

 

 

 

 

(72.4 cm)

 

1(2.5 cm) Min. Above Toekick or

Adjust to Oven Installation Height

1(2.5 cm) Min. Above Toekick

NOTE: Additional clearances between cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior 23 1/2(59.7 cm) depth and 9 1/4(23.5 cm) height.

These Monogram Ovens require 3/4(1.9 cm) overlap on both sides. Allow 1(2.5 cm) Min. for top overlap and clearance to upper doors.

The Monogram Warming Drawers require 5/8(1.6 cm) overlap on all sides.

When installing a Monogram Warming Drawer below a single or double oven, a separate 120V, 60 Hz, properly grounded receptacle must be installed. Refer to installation instructions packed with the Warming Drawer for specific installation requirements.

A6 Cutout for Frameless Cabinets

Frameless Cabinets

Whenever possible, order 30(76.2 cm) frameless cabinet with the cutout sided to fit the oven. If using stock cabinets, additional finished filler pieces may be required to cover the opening.

A stock frameless cabinet cutout width may be up to 28 3/4(73 cm). If necessary, add 1/2(1.3 cm) cleats to the sides, flush with the front edge of the side panels to accept mounting screws.

 

 

 

 

 

30

 

 

 

(76.2

cm)

Install 1/2

 

 

 

 

 

(1.3 cm)

 

 

 

 

 

Cleats to

 

 

 

 

 

Hold Oven

 

 

 

 

 

Mounting

 

 

 

 

 

28

1/2

(72.4 cm)

Screws

 

 

 

Min.

 

 

28

5/8

(72.7 cm)

Double

 

 

 

 

Max.

51 15/16

(131.8 cm)

 

 

 

 

 

Single

 

 

 

 

 

 

27 5/16

(69.2 cm)

 

 

 

 

 

Cabinet Depth

231/2(59.7 cm)

Min. From Inside Back to Front of Cabinet Frame or Side Panel

3/4(1.9 cm) Min.

Thick Bottom Shelf Cut Back Flush with Front of Side Panel

8

Page 8
Image 8
GE ZET2 Cabinetry, A6 Cutout for Frameless Cabinets, Single Oven Cutout, for Installation Over, a Monogram Warming, Drawer