Duct Tape Over Transition
STEP 4 CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING: If house wiring is not
2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.
AVERTISSEMENT – Si le câblage
de la maison n’est pas du type à deux fils avec un fil de terre, l’installateur doit fournir un circuit de terre. Quand les fils de la maison sont en aluminium, il prendre soin d’utiliser de la pâte antioxidation approuvée par UL et des connecteurs pour l’aluminium-cuivre.
Duct Tape
Over Seam
and Screw

Installation Instructions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEP 3

CONNECT DUCTWORK

 

STEP 5

INSTALL DUCT COVERS

• Install ductwork, making connections in direction of

 

Note: For easier handling, remove cardboard insert

airflow as illustrated.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

after film is peeled off.

• Secure joints in ductwork with sheetmetal screws.

 

 

 

 

• Wrap all duct joints with

 

 

 

 

 

 

 

 

 

 

 

Remove protective film from duct covers. If more than

duct tape for an airtight seal.

 

 

 

 

 

 

 

 

 

 

 

one duct cover is used, secure each piece together with

• Use duct tape to seal the

 

 

 

 

 

 

 

 

 

 

 

screws provided.

flange connection.

 

 

 

 

 

 

 

Air Flow

 

• Place the duct cover(s) on top of the hood.

Reach inside the

 

 

 

 

 

 

 

 

• From inside the hood, secure the duct cover to the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

hood and push

 

 

 

 

 

 

 

 

 

Screw

 

top with the small Phillips head screws supplied with

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the damper up

 

 

 

 

 

 

 

 

the covers.

 

 

 

 

 

 

 

 

 

 

 

to be sure it

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

moves freely.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A Remove

B Insert Power

Junction Box

Conduit Thru

Cover

Strain Relief

 

and Tighten

 

Ground

 

C Use UL Listed

 

Wire Nuts

White

Black

STEP 6 INSTALL MOTOR

 

Outlet

Attachment

Spring

Slot

Clip

From the inside of the hood, slip motor into the attachment slot on the left.

Rotate motor upwards until it snaps into the spring clip on the right.

Secure the motor to the hood with the machine screw and lock washer. (Screw is marked with red or blue paint.)

Plug connector into the motor.

Attachment

Screw

Top

IMPORTANT: Connector ends

Spring

are designed to mate only

Clip

 

one way. Match flat and

 

round connectors as shown.

 

Use wire nuts to connect incoming ground to green, white to white and black to black.

Push wires into junction box and replace cover. Be sure wires are not pinched.

13

Page 13
Image 13
GE ZV30R, ZV36R, ZV48R installation instructions Connect Ductwork, Install Duct Covers, Install Motor