GE Monogram JGP645 Plan The Ductwork, Ductwork Arrangement, Installation Instructions

Models: JGP645

1 28
Download 28 pages 40.66 Kb
Page 16
Image 16
PLAN THE DUCTWORK

INSTALLATION INSTRUCTIONS

(continued)

PLAN THE DUCTWORK

Prepare ductwork to vent to outdoors:2

214

15

DUCTWORK ARRANGEMENT 314Manual background Transition (supplied

Manual background 314Manual background with blower/motor)

712

Manual background10Manual background

314

Adjustable

5to 8

Manual background 1314Manual background

Prepare ductwork to vent to outdoors:

Use the shortest and straightest duct run possible.

Duct run should not exceed equivalent length of 150 feet. Refer to “Duct Fittings” chart to calculate equivalent length for various duct configurations.

This downdraft blower system is designed for use with 314″ x 10″ ductwork. It can be transitioned to 6″ round.

Ductwork MUST be vented to the outside. Never vent into a crawl space, attic or other enclosed space.

DUCTWORK ARRANGEMENT

Right discharge

Left discharge (as shipped)

The downdraft vent is shipped with the discharge outlet on the left side. It can be changed to the right side to avoid interference in routing the ductwork.

To change the ductwork to the right side, remove the screws holding the outlet panel to the bottom of the vent.

Remove and rotate the panel and fasten with screws.

The blower can be mounted in the cabinet or under the floor. The blower will fit between floor joists on 16″ centers.

16

Page 16
Image 16
GE Monogram JGP645 operating instructions Plan The Ductwork, Ductwork Arrangement, Installation Instructions