Installation Preparation
REMOVE THE PACKAGING
The vent hood is shipped secured to a shipping board with 4 screws.
•Remove the duct cover, parts box and styrofoam packaging.
•Lift the hood out of the box, using hand grips on both sides of the shipping board.
•Remove and properly discard the plastic wrapping.
Mounting Screw
Shipping Board
•Locate and remove 2 screws at the top of the assembly and 2 screws inside the hood behind the filter guides on the left and right sides. Discard the shipping board.
Junction
Box
Knockout |
|
| Mounting |
Mounting | Screw |
Screw |
|
| Shipping |
| Board |
• Remove junction box cover.
• Remove knockout from junction box.
• Install strain relief onto junction box.
Check Installation Hardware
Locate the hardware accessory box packed with the hood and check contents.
10 Wood |
|
|
Screws | 10 Metal Wall | 2 Mounting Brackets |
| ||
| Fasteners | |
|
|
2Large Flat Washers
Decorative
Duct
Covers
Duct Cover Bracket
(not required for recirculating operation)
2 Phillips Head
Decorative Screws
2 Side Bars with 4 Machine Screws
CL
| 3 Stainless |
CL | Steel Grease |
| Filters |
CL |
|
Wall Mount Template |
|
Check contents of the required accessory, ZXR758 or ZXR7510.
2 Wood
Screws
2 Plastic | Air Deflector with |
Wall Fasteners | Upper Duct |
| Connector |
2 Phillips Head
Decorative Screws
Recirculating |
|
Decorative |
|
Duct Cover | 3 Charcoal Filters |
|
5