GE Monogram ZXR7510 Remove The Packaging, Check Installation Hardware, Installation Preparation

Models: ZXR7510 ZXR758

1 12
Download 12 pages 13.91 Kb
Page 5
Image 5
REMOVE THE PACKAGING

Installation Preparation

REMOVE THE PACKAGING

The vent hood is shipped secured to a shipping board with 4 screws.

Remove the duct cover, parts box and styrofoam packaging.

Lift the hood out of the box, using hand grips on both sides of the shipping board.

Remove and properly discard the plastic wrapping.

Mounting Screw

Shipping Board

Locate and remove 2 screws at the top of the assembly and 2 screws inside the hood behind the filter guides on the left and right sides. Discard the shipping board.

Junction

Box

Knockout

 

 

Mounting

Mounting

Screw

Screw

 

 

Shipping

 

Board

• Remove junction box cover.

• Remove knockout from junction box.

• Install strain relief onto junction box.

Check Installation Hardware

Locate the hardware accessory box packed with the hood and check contents.

10 Wood

 

 

Screws

10 Metal Wall

2 Mounting Brackets

 

 

Fasteners

 

 

2Large Flat Washers

Decorative

Duct

Covers

Duct Cover Bracket

(not required for recirculating operation)

2 Phillips Head

Decorative Screws

2 Side Bars with 4 Machine Screws

CL

 

3 Stainless

CL

Steel Grease

 

Filters

CL

 

Wall Mount Template

 

Check contents of the required accessory, ZXR758 or ZXR7510.

2 Wood

Screws

2 Plastic

Air Deflector with

Wall Fasteners

Upper Duct

 

Connector

2 Phillips Head

Decorative Screws

Recirculating

 

Decorative

 

Duct Cover

3 Charcoal Filters

 

5

Page 5
Image 5
GE Monogram ZXR7510, ZXR758 Remove The Packaging, Check Installation Hardware, Installation Preparation