Generac ASPAS1CCL015 owner manual Maintenance, Level, Tasks

Models: ASPAS1CCL015

1 48
Download 48 pages 7.32 Kb
Page 22
Image 22
Maintenance

Section 4 — Maintenance

Carrier Liquid-cooled 15 kW Generators

Maintenance

Level 1

 

Level 2

 

Level 3

 

Level 4

 

Tasks

Recom-

Task

Required

Task

Required

Task

 

Task

 

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

 

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

 

monthly/

Initials)

Break-in

Initials)

annually/

Initials)

Annually/

Initials)

 

10 hrs.

 

30 hrs.

 

50 hrs.

 

100 hrs.

 

13.Initiate an automatic start and transfer of the unit to site load and exercise it for

at least 1 hour looking for leaks, loose connections or components, and abnormal operating conditions. Correct as necessary.

14.Start and exercise the unit at full rated load (use a load bank if the site load is

not enough) for at least 2 hours looking for leaks, loose connections or components, and abnormal operating conditions. Correct as necessary.

15. Change the engine oil.

16.Replace the engine oil filter(s).

17.Replace the engine air filter(s).

18.Check the engine spark plugs on gas engine driven

units. Clean and re-gap or replace as necessary.

19. Perform a 5 minute no-load operational run of the unit looking for any post service problems.

20. Return the unit to standby setup for operation when required.

20 Carrier

Page 22
Image 22
Generac ASPAS1CCL015 owner manual Maintenance, Level, Tasks