Manuals
/
Generac Power Systems
/
Household Appliance
/
Fan
Generac Power Systems
OG 2697 manual
Models:
OG 2697
1
19
20
20
Download
20 pages
11.27 Kb
13
14
15
16
17
18
19
20
<
>
Install
Site Preparation & Generator Placement
When three-conductorwiring is used, two
Setting The Automatic Exercise Function
After the engine has completed its cool down cycle and shut down, shut OFF utility power again
Use the transfer handle to move the main contacts in the transfer switch to the UP utility position. Switch the 2-polebreaker ON in the distribution panel
Page 19
Image 19
Notes
18
Page 18
Page 20
Page 19
Image 19
Page 18
Page 20
Contents
Generator INSTALLATION GUIDELINES
General Hazards
Before Installation
Generator Installation
NFPA Standards
Other Published Standards
Battery Installation
Grounding the Generator
Vented Batteries
Before You Begin
Site Preparation & Generator Placement
Make sure the generator is level within ½ inch
Converting To LP Vapor
Installing & Connecting Gas Lines
Page
External Electrical Connections
Installing The Automatic Transfer Switch
When three-conductorwiring is used, two
Operational Tests
Page
Use the transfer handle to move the main contacts in the transfer switch to the UP utility position. Switch the 2-polebreaker ON in the distribution panel
After the engine has completed its cool down cycle and shut down, shut OFF utility power again
Setting The Automatic Exercise Function