Operator's Manual

First Edition • Eighth Printing

 

 

 

 

FUNCTION TESTS

Test One-Speed Winch Operation

1Install a load handling attachment.

2Raise the carriage by

firmly grasping the

down

winch handles and

 

rotating them towards

 

the mast.

 

Result: The winch up should operate smoothly, free of hesitation or binding.

3Lower the carriage by firmly grasping the winch handles and rotating them away from the mast. After lowering to the desired position, turn the winch handles toward the mast (raise the load) 1/4 turn to set the brake.

Result: The winch should operate smoothly, free of hesitation or binding.

Test Two-Speed Winch Operation

1Install a load handling attachment.

2Shift the winch to the slow speed.

3Raise the carriage by firmly grasping the winch handles and rotating

them towards the

down

mast.

 

Result: The winch

 

should operate

 

smoothly, free of

 

hesitation or binding. up

 

4Lower the carriage by firmly grasping the

winch handles and rotating them away from the mast. After lowering to the desired position, turn the winch handles toward the mast (raise the load) 1/4 turn to set the brake.

Result: The winch should operate smoothly, free of hesitation or binding.

5Shift the winch to the fast speed and repeat steps 3 and 4.

Test Mast Sequencing

1Install a load handling attachment.

2Raise the carriage to full height by firmly grasping the winch handles and rotating them towards the mast.

Result: The carriage should raise to the top of the front mast section, followed in consecutive order by each mast section.

3Fully lower the carriage. After lowering to the desired position, turn the winch handles toward the mast (raise the load) 1/4 turn to set the brake.

12

Genie Superlift Contractor

Part No.33547

Page 14
Image 14
Genie 33547 manual Test One-Speed Winch Operation, Test Two-Speed Winch Operation, Test Mast Sequencing