First Edition • Eighth Printing

Operator's Manual

 

 

 

 

 

 

Boom

Load Positioning Instructions

1Determine the weight of the load and the location of its load center.

2Refer to the chart below to determine if the machine is capable of lifting the weight at the location on the boom.

3Secure the load to the lifting shackle on the boom.

measure to the load center

18 in

24 in

32 in

42 in

46 cm

61 cm

81 cm

107 cm

LOAD CAPACITY CHARTS

Maximum Load Centers

(measure from the front of the carriage)

Standard Forks

24 in

61 cm

Adjustable Forks

24 in

61 cm

Boom

42 in

107 cm

Load Platform

24 in

61 cm

Pipe Cradle

18 in

46 cm

Fork Extensions

42 in

107 cm

Load Capacity Chart

Load Center

inches

14

16

18

20

22

24

26

28

30

32

34

36

38

40

42

cm

36

41

46

51

56

61

66

71

76

81

86

91

97

102

107

Model

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLC-6

lbs

650

610

565

515

470

425

385

350

315

285

260

235

215

195

180

 

kg

295

277

256

234

213

193

175

159

143

129

118

107

98

89

82

SLC-12

lbs

650

610

565

515

470

425

385

350

315

285

260

235

215

195

180

 

kg

295

277

256

234

213

193

175

159

143

129

118

107

98

89

82

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLC-18

lbs

650

610

565

515

470

425

385

345

310

275

250

225

200

180

160

 

kg

295

277

256

234

213

193

175

157

141

125

113

102

91

82

73

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLC-24

lbs

650

610

565

515

470

425

385

345

310

275

250

225

200

180

160

 

kg

295

277

256

234

213

193

175

157

141

125

113

102

91

82

73

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part No.33547

Genie Superlift Contractor

17

Page 19
Image 19
Genie 33547 manual Boom Load Positioning Instructions, Maximum Load Centers, Load Capacity Chart Load Center, Model