8 Genie Superlift Contractor Part No. 33547
Operator's Manual First Edition • Eighth Printing
PRE-OPERATION INSPECTION
Pre-operation Inspection
RBe sure that the operator’s manual is complete,
legible and in the storage container located on
the machine.
RBe sure that all decals are legible and in place.
See Decals section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
RWinch and related components
RBase components
RLegs
RStabilizers and latch plates (if equipped)
RMast columns
RCarriage hold-down bar
RCable anchor
RCable and pulleys
RWheels and casters
RLoad handling attachments
RNuts, bolts and other fasteners
RCable (kinks, frays, abrasions)
Check the entire machine for:
RDents or damage
RCorrosion or oxidation
RCracks in welds or structural components
RBe sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
RBe sure there is a minimum of 4 wraps of cable
around the winch drum when the carriage is fully
lowered.