Shutdown and Cleaning
Pail Flushing
•For short term shutdown periods (overnight to two days) refer to Short Term Storage, page 22.
•For flushing after spraying
•For flushing after spraying
1.Relieve pressure, page 10.
2.Remove tip and guard assembly from gun and place in flushing fluid.
3.Lift suction tube and prime tube from paint pail. Let them drain into paint pail for a while.
4.Separate prime tube (smaller)
from suction tube (larger).
ti2039a
5.Place empty waste and water or solvent pails side by side.
ti9726a
Shutdown and Cleaning
6.Place prime tube in waste pail.
ti9652a
7.Submerge suction tube in water or flushing solvent.
ti9651a
8.Turn pressure control knob to the Prime/Clean setting.
ti9344a
9. Turn power switch ON.
ti5580a
10.Flush until approximately 1/3 of the flushing fluid is emptied from the pail.
11. Turn power switch OFF.
ti2018a
312001R | 17 |